CoorsTek, Inc.

Project included: The demolition of existing concrete manhole and installation of a new Fiberglass parshall flume metering manhole and flume. This job took a great deal of skill and care to work around a tight set of existing utility lines and masonry walls. Construction was phased in a method to allow the installation of concrete base slab to be poured and the bypass of existing flows were minimized for only a few days.

Owner CoorsTek, Inc.
Engineer This project Just like many of our projects was design-build. The client trusted us to customize a tailor-fit design for them
Value $20,000.00
Contract Duration 10 Days