Sierra Ridge Lift Station

The work included the completion of a 30 foot deep cast-in-place concrete wetwell, dry well, drilled caissons and building slab. The construction of a masonry building and roof system to house the electrical equipment and automatic transfer switch for standby generator. The site work included the installation of the forcemain, metering flume, polylined overflow pond, perimeter site fence and gravel drive.

Owner Lennar Homes
Engineer TST/TTG
Value $719,795.00
Contract Duration 180 Days